Slurry Pipeline Projects
Feature image

Feature image

Project Name Client Country Type of Engineering Type of Fluid Project Status Year
Drains and vents Implementation Engineering - Concentrate Minera Centinela Chile Basic Copper Concentrate Closed 2016
Detailed Engineering, Factory and Installation Inspection and performance test Short term solution for pumping the underflow thickener N° 3 Minera Escondida Ltda. Chile Detailed Copper Concentrate Ongoing 2016
Detailed Engineering of Replacement Pumps thickener 3 Minera Escondida Ltda. Chile Detailed Copper Concentrate Ongoing 2016
Monitoring Station Hydraulic Evaluation (PMS1) Antamina Perú Study Copper Concentrate Ongoing 2016
Basic Engineering for Filter PF01 to PF 04 Feeding Minera Escondida Ltda. Chile Basic Copper Concentrate Ongoing 2016
EPC for Replacement of Pipeline 7" and 8" CMDIC Chile EPC Copper Concentrate Ongoing 2016
Detailed Engineering - Alimentation Enhancement of Filter 5 Minera Escondida Ltda. Chile Detailed Copper Concentrate Ongoing 2016
Post PEM Support Acciona Chile Support Iron Concentrate and Desalinated Water Closed 2015
By-pass Line Detailed Engineering - OGP1 Minera Escondida Ltda. Chile Detailed Copper Concentrate Ongoing 2015
By-pass of existing 7 inches slurry pipeline CMDIC Chile Basic Copper Concentrate Closed 2015
Identification study - Operational Continuity for Los Colorados Plant - Concentrate Transportation System and Plant Water Supply Minera Escondida Ltda. Chile Study Copper Concentrate Closed 2014
Estimating the areas of wear and tear in some parts of the System by CFD simulation Minera Escondida Ltda. Chile Study Copper Concentrate Closed 2014
CNN Cyclone Feeding Hydraulic Study CAP Minería Chile Study Iron Concentrate Closed 2014
Instrumental Engineering for EIA Concentrate pipeline Minera Spence Chile Study Copper Concentrate Closed 2014
Conceptual Engineering for STC and STA - TOFO Project CAP Minería Chile Conceptual Iron Concentrate and Desalinated Water Closed 2014
Conceptual Analysis - Concentrate Relocation GOLDCORP Chile Conceptual Copper Concentrate Closed 2013
Gap Analysis for Water and Concentrate Pipeline - Dominga Project Worley Parsons Chile Study Iron Concentrate and Desalinated Water Closed 2013
Santo Domingo Minera Santo Domingo Chile Feasibility Iron In Development 2013
Realocação Mineroduto Samarco / Vale / BHP Billiton Brasil Conceptual Iron In Development 2013
Vale Vale Brasil Basic
Conceptual
Iron In Development 2013
Mineroduto de Fosfato Anglo American Brasil Conceptual Phosphate In Development 2013
El Tofo CAP Minería Chile Scoping Iron Completed 2012
Vale Vale Brasil Trade-off Phosphate Completed 2012
Vale Vale Brasil Detailed
Basic
Bauxite Completed 2012
Cerro Negro Norte CAP Minería Chile Field Engineering
Detailed
Conceptual
Iron In Development 2012-2007
Escondida Concentrate Transport (ECT) Minera Escondida Chile Start Up
Commissioning
Field Engineering
Detailed
Copper Completed 2012
Cerro Casale Barrick Chile Consultancy Copper Completed 2012
OGP 1 Minera Escondida Chile Detailed
Feasibility
Copper In Development
Completed
2012
2011
Escondida Concentrate Transport (ECT) Minera Escondida Chile Consultancy Copper Completed 2012
Coloso Concentrate Pipeline (CCP) Minera Escondida Chile Start Up
Commissioning
Field Engineering
Detailed
Feasibility
Copper Completed 2012
2012
2011
2010
2010
MMX MMX Brasil Basic
Conceptual
Trade-off
Feasibility
Ferro Completed 2012
2012
2012
2011
Spence Hypogene Minera Spence Chile Conceptual Copper Completed 2011
El Pachón Xtrata Argentina Feasibility Copper Completed 2011
Fase III Collahuasi Minera Doña Inés de Collahuasi Chile Feasibility Copper Completed 2011
Fosfertil Fosfertil Brasil Detailed
Basic
Conceptual
Feasibility
Phosphate Completed 2011
2011
2008
2007
Mineroduto Sul Americana de Metais Brasil Basic
Conceptual
Feasibility
Iron Completed 2011
2011
2010
El Morro Goldcorp Xtrata Chile Detailed
Basic
Conceptual
Copper Completed 2010-2007
Fase III Collahuasi Minera Doña Inés de Collahuasi Chile Conceptual Copper Completed 2010
Escondida Concentrate Transport (ECT) Minera Escondida Chile Conceptual Copper Completed 2010
Cerro Casale Cerro Casale Chile Basic
Detailed
Copper Completed 2010
Galeno Lumina Copper SAC Perú Feasibility
Route
Consultancy
Copper Completed 2010-2009
Ampliación Pelambres Minera Los Pelambres Chile Feasibility
Route
Conceptual
Copper Completed 2010
Isua London Mining USA Feasibility Copper Completed 2009
Roca Roja Minera Escondida Chile Detailed Copper Completed 2009
Pelambres Minera Los Pelambres Chile Conceptual Copper Completed 2009-2008
Mantonverde Anglo American Chile Conceptual Iron Completed 2010
Rehabilitación Mineroducto 7" Minera Doña Inés de Collahuasi Chile Detailed Copper Completed 2009
Ferrous Ferrous Resources Brasil Basic
Conceptual
Feasibility
Iron Completed 2010
2009
2008
Fosfertil Fosfertil Brasil Feasibility Iron Completed 2008
Esperanza Minera Esperanza Chile Consultancy Copper Completed 2008
EPCM Collahuasi 8" Minera Doña Inés de Collahuasi Chile Start Up
Commissioning
Construction Mgmt.
Detailed
Feasibility
Copper Completed 2007-2006
Esperanza Minera Esperanza Chile Conceptual Copper Completed 2007
Planta Molibdeno Minera Escondida Chile Consultancy Molybdenum Completed 2008-2005
Los Colorados CAP Minería Chile Scoping Iron Completed 2008
Hierro Atacama CAP Minería Chile Conceptual Iron Completed 2008
Hierro Atacama CAP Minería Chile Detailed
Basic
Conceptual
Iron Completed 2006
2004
2004
Paragominas Vale Brasil Detailed
Feasibility
Bauxite Completed 2008
Las Tórtolas Anglo American Chile Detailed Copper Completed 2005
Project Name Client Country Type of Engineering Project Status Year
Project Name Client Country Type of Engineering Type of Slurry Project Status Year
BRASS Engineering, 2017